NORD Drivesystems

Cost reduction through efficient energy-saving motors

NORD DRIVESYSTEMS has developed a new synchronous motor with significantly higher energy efficiency (IE5+). It is a supplement to the standardised geared motor variants of the LogiDrive systems and is particularly suitable for reducing the number of variants. This makes the IE5+ synchronous motor particularly suitable for use in intralogistics.

Datalogic News

THE NEW DATALOGIC MEMOR 20 COMBINES THE ENTERPRISE PDA STRENGTH WITH THE USER FRIENDLINESS OF A SMARTPHONE

With the new Memor 20, Datalogic is launching a PDA that empowers users in retail, field services, logistic environments, and healthcare, with a device that combines the best features of a smartphone with the highest standards of enterprise level devices.

Flowserve News

SIHI® DRY PD MI SERIES VACUUM PUMPS

Eliminate fluid purchasing and disposal costs, improve throughput times and process efficiencies.

Schmalz News

Enough Space for a Cool Head

What should you do if you want an ergonomic lifting aid, but your ceiling height is too low for conventional crane systems? Schmalz’s solution is a modular flat jib made of aluminum that guarantees smooth movement sequences, even in low rooms. This novelty arrived at just the right time for Erkodent: The dental thermoforming device manufacturer wanted to optimize the packaging process at the end of the assembly line and needed a solution that left enough space for an air-conditioning system that had already been planned.

Turck News

Programmable RGBW LED Strip With 19 Colors

The programmable WLS27 Pro combines illumination and visualization of data and status — also via IO-Link.

JUNGHEINRICH News

Jungheinrich Rental Fleet Management for hagebau Logistik

hagebau Logistik will rely entirely on Jungheinrich material handling equipment in the future. At hagebau Logistik's five logistics sites in Westerkappeln, Neumünster, Herten, Schleinitz and Burgau, the material handling equipment by various brands used to date will be replaced by some 200 Jungheinrich trucks.

Arkema News

The construction of Arkema 4 is on track!

The current health crisis spares nobody, and every single company is impacted to some degree. Initiated last year by the Arkema Group and the Lalou Multi team, the construction of the new Multi50 Arkema 4 in Verdon-sur-Mer has also felt the fall-out from this crisis: loss of staff, problems in procuring materials, and sanitary measures put in place on a construction site where over 20 people would normally be working. Despite the delay, the construction and assembly of the new trimaran are making steady progress, and the launch of this new machine, under the watchful eye of Quentin Vlamynck, has been rescheduled for July 2020.

Elesa + Ganter News

Accessories for hydraulic systems compliant to ATEX European Directive

ELESA+GANTER ATEX line includes plugs, breather caps, oil level sight glasses and oil lever indicators complying with health and safety requirements according to the new 2014/34/UE ATEX European Directive (explosive atmospheres) for equipment in Group II, category 2GD.

Join the 155,000+ IMP followers